How to do a level survey
Formulas, a worked example and common mistakes in differential leveling on site.
What is differential leveling?
It is the method used to find the reduced level (elevation) of points on the ground or on a structure from a point of known level: the benchmark. With a level and a staff you measure the height difference between the benchmark and each point. It is the basis for checking slabs, floors, pads, earthworks, footings and pipe gradients.
Terms you need
- Benchmark (BM): a fixed point with a known or assumed level, for example 100.000.
- Backsight (BS, +): the staff reading taken on the benchmark.
- Height of instrument (HI): the level of the instrument's line of sight.
- Foresight or intermediate sight (FS / IS, −): the staff reading on each point.
- Design level: the level the point should have according to the drawings.
- Tolerance: how far above or below the design level the point is allowed to be.
The formulas
Point level = HI − Reading
Difference = Point level − Design level
If the difference is positive, the point is high (excess material); if it is negative, the point is low (missing material).
Worked example
- The benchmark has a level of 100.000 and the backsight is 1.523.
- Height of instrument: 100.000 + 1.523 = 101.523.
- On a point of the slab you read 0.318: level = 101.523 − 0.318 = 101.205.
- The design level is 101.200: difference = 101.205 − 101.200 = +0.005 (5 mm high).
- With a tolerance of ±0.010, the point is within tolerance.
Here are four points on the same slab (design 101.200, tolerance ±0.010):
| Point | Reading | Level | Difference | Result |
|---|---|---|---|---|
| A1 | 0.318 | 101.205 | +0.005 | Within tolerance |
| A2 | 0.335 | 101.188 | −0.012 | Low: fill |
| A3 | 0.309 | 101.214 | +0.014 | High: cut |
| A4 | 0.326 | 101.197 | −0.003 | Within tolerance |
Moving the instrument
When you can no longer see the staff or the ground rises too much, the level has to be moved. Before moving it, read a solid point (turning point, TP); after moving it, read that same point again. The new height of instrument is the turning point's level plus the new backsight. This way the leveling continues without losing the reference.
Grid or linear leveling
Grid leveling is for surfaces: slabs, floors, pads and earthworks, with points in rows and columns at regular spacing. Linear leveling is for long elements: curbs, gridlines, beams and pipes, with chainages and a design gradient.
Common mistakes
- Tilted staff: the reading comes out too high. Use a staff bubble, or rock the staff slowly and record the lowest reading.
- Instrument not level: check the bubble before each set of readings.
- Booking errors: a wrong digit, or readings swapped when typing them into the computer.
- Not closing the survey: when you finish, read the benchmark again to check that the height of instrument has not changed.